Fuel Farm Evaluation & Upgrade 400Hz Ground Service System
Charleston International Airport, South Carolina
| Client Challenge: |
Aging aircraft ground power systems with high maintenance costs and obsolete replacement parts had become a limiting factor for gate aircraft mix and lease attraction. |
| |
| PRIME Solution: |
Conducted feasibility studies and cost benefit analysis for upgrades to determine effectiveness of a point-of-use power upgrade and replacement vs. a new central system. Proposed solution will realize a maintenance cost reduction of 50%. |
Prime Engineering provided fueling, civil, environmental, and electrical engineering services for upgrades of passenger loading and aircraft support systems at the Charleston International Airport.
Project scope included modification and/or replacement of the following items:
- Site stormwater piping and containment control
- Fueling control systems
- Fuel pumping and dispensing systems
- Pumping station fuel containment pad
- Overfill/grounding verification systems
- Site grading
- Emergency power systems
- 400 Hz Ground Service System
|
 |
Roll over thumbnail to view picture
|
|