Coca-Cola Bottling Plant
Jacksonville, Florida
| Client Challenge: |
To better compete in growing consumer demand for bottled water, Coca-Cola Enterprises desired to add a new production line |
| |
| PRIME Solution: |
Provided fast-track design-build services for development of new production line for bottled water. |
Prime Engineering, Inc. provided design-build services for facility modifications related to the installation of a new bottled water production line at Coca-Cola Enterprises’ Jacksonville facility. Project involved existing building and system modifications and new construction to accommodate addition of new 1,300sf water treatment facility and the addition of special production equipment.
Full service civil, mechanical, electrical and structural engineering design included:
- Utility systems modifications
- Construction of a new water treatment room
- Relocation of the existing machine room equipment and equipment installation
- Construction of a new isolation room to house the proposed ozone generation equipment
- Construction of a new clean room for product filling and ozone containment
- Construction of specialty ventilation, filtration, odor controls, and ozone monitoring systems
|
 |
Roll over thumbnail to view picture
|
Specific services included:
- Inventory/surveying existing facilities
- Developing engineering design/documentation responding to program requirements
- Project scheduling and budgeting
- Construction administration including on-site project representation and direction of field personnel
- Field testing administration and coordination
- Progress monitoring services
- Project closeout services
- Start-up assistance services including training assistance
- Record drawings and supplemental documents services
- Warranty review services
|